The Green Bee full underground container has been designed to generate as little urban impact as possible, with maximum respect for the environment and the users. It is an eco-friendly underground container, highlighting its large capacity, robustness and resistance and minimal maintenance needs.
The compression of the waste by its own weight allows a higher density than the surface containers, which increases the storage capacity and reduces the collection trips. Indeed, investment and operating costs are low due to their simplicity, large capacity and quick collection operation, without hydraulic systems or any other mechanical systems.
This new lassoTM container colection is characterized by its high mechanical and fire resistance (classification M0), obtained thanks to its monobloc reinforced concrete structure class C40 / 50. The occupation of the surface space and the visual impact are very small, since the whole volume for deposition of waste is buried and the deposition frame is small and functional. The lower temperatures in the subsoil slow down the growth of bacteria, contributing to the reduction of odors, minimizing negative impacts in residential areas.
The Green Bee column is made of stainless steel and hot galvanized steel, guaranteeing a total resistance to corrosion. It is compatible with single ring coupling system, double ring or Kinshoffer system for lifting in the unloading operation, ensuring total safety for the operator. As an option, you can also incorporate a smartie battery disposal and a pedal. It also allows to guarantee a vertical waste deposition axis up to about 5% of slope, which makes it more flexible and adaptable to various types of location.
# |
Components |
Description |
A |
Quick System |
By single ring, double ring (**) or Kinshoffer system (**), incorporated in the deposition column. |
B |
Column |
green bee: stainless steel; optionally can incorporate pedal. |
C |
Ground lids |
Olive leaf: stainless steel Pavement: to have a finish equal to that of the surrounding (Portuguese pavement, etc). |
D |
Ground ring |
In hot galvanized steel, it has a connection with rainwater; can have built-in retractable balcony. |
E |
Extraction system |
Flexible: Standard bag: Polypropylene; can use a disposal bag for the collection of undifferenciated waste; can be reinforced for glass waste Saco MasterbagTM (Patent EP2194005 A1): in polypropylene and PVC, is a sealing element of waste extraction that allows leachate retention. Rígid: Metal Container: in hot galvanized steel, bottom opening with single or double door; allows leachate retention; the fore resistancerating is M0. |
F |
Well |
Monobloc well in concrete C40/50, designed to resist impulsion forces. It has an innovative integrated system for leachate retention. |
|
Integrated system for leachate retention |
The concrete well is provided with a conical bottom that directs leachate into a drain tank which is conected to an in-built wall pipe, allowing leachate vacuuming, making the cleaning operation estremly quick and effective. |
G |
Leachate drainer (optional) |
Just for container with flexible bag; prevents the contact of the lifting bag with any leachate. |
H |
Signaletic panels |
Front and top signaletic panels are available in thermo lacquerd aluminum, with silkscreen printing or high resistance vynil with UV lamination and digital printing. |
|
Optional : |
|
|
Smartie battery disposal |
Incorporated in the deposition column; usualy in the container dedicated to the glass waste. |
|
Bag dispenser for canine waste |
Incorporated in the undifferentiated waste container. |
|
Retractable safety barrier |
Vertical safety barrier. |
|
Safety platform (*)(**) |
Horizontal safety platform. |
# |
Dimensions |
3 m3 |
5 m3 |
A |
Total underground area height |
1990 mm |
2870 mm |
ᴓB |
Ground lid diametre |
1850 mm |
1850 mm |
C |
Column height |
800 mm |
800 mm |
ᴓ |
Diametre of the deposition duct |
550 mm |
550 mm |
|
Column weight + ground lid |
Aprox. 200 Kg |
Aprox. 200 Kg |
|
Well weight |
Aprox. 3 ton. |
Aprox. 4 ton. |
Components - Optional
STANDARD INSTALLATION
01. Dig a pit with a depth of 2,0m (3m3) or 2,9m (5m3), and a width of 2,45m. .
02. Create a well-compacted layer and stabilize the bottom.
03. Place the set well-ground-ring inside the pit, ensuring its vertical position.
04. Proceed by filling the empty spaces around the container and well-compacted filling materail.
05. Connect the ground ring to a rain water sewer system and finish the surrounding area.
06. Place the set column + extracting system in the installed well.